LBI is currently working on the $334.9 million LAWA Roadway Utilities Enabling Project where LBI currently has three active projects in the works:
Project 1: This work entails the installation of approxametly 524 linear feet of 8inch VCP and (2) new manholes on 98th street. Parallel to century Blvd. approxametly 1,428 linear feet of 8inch VCP will be installed along with (5) new manholes and the manhole remodel of (1) manhole. Following the completion of the 8inch VCP, (2) service laterals for shell and Denny’s will be constructed out of 6″ PVC.
Project 2: This work entails the removal of existing MONO C.I pipe and A.C pipe. Following this removal, 12″ ductile iron pipe will be installed in lieu of removed pipe. The total amount of 12″ D.I pipe to be installed amounts to 3,082 LF along with 221 LF of 12″ steel pipe and 662 LF of 6″ D.I pipe. In addition to the installation of D.I pipe, this scope will include the removal of (5) fire hydrants and install of (17) fire hydrants.
Project 3: This work entails the removal of existing MONO C.I pipe and A.C pipe. Following this removal, 12″ ductile iron pipe will be installed in lieu of removed pipe. The total amount of 12″ D.I pipe to be installed amounts to 2,961 LF along with 268 LF of 12″ steel pipe and 662 LF of 6″ D.I pipe. In addition to the installation of D.I pipe, this scope will include the removal of (5) fire hydrants and install of (17) fire hydrants.