LBI served as the General Contractor for the City of Brea to complete a quarter mile long multi-use pedestrian and bike trail through the former railroad property north of Birch St., between the Brea Canyon Flood Control Channel and Brea Blvd. The work consisted of soil remediation, grading, and importing 30,000 CY of dirt, concrete stairs, bike trough, bio- swale, and landscaping. The additional scope of work added to LBI contract included the construction a restroom and plaza facility, storm drain system, 6000 linear feet of curb/gutters, and 20,000 square feet of decorative pavers. All work was required to conform to Americans with Disabilities Act standards. Additionally, LBI was required to follow strict disposal procedures for the contaminated soils found on the Project.
Final Contract Price: $2.92M